74 filings (land-use applications and site plans) that mention a data center, from Loudoun County records; 30 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
1501 MORAN ROAD : A Zoning Conversion to convert the property to PD-IP district pursuantto the Revised 1993 Zoning Ordinance and a Special Exception to increase density to1.0 FAR considering developing with data center…
-
1501 MORAN ROAD : A Special Exception to increase density to 1.0 FAR considering developing with data center use.
-
Site Plan Amendment to previously approved EPLAN-2023-0087 which is a 42 megawatt data center with the associated infrastructure, roads, parking, & utilities.
-
1501 MORAN ROAD - AS02: This plan proposes a data center with the associated utilities, roads, and parking. STPL
-
DULLES DOWNS ZMAP-2024-0014: A Zoning Conversion in the Route 28 Tax District to convert two parcels (PINs 045-28-2657 and 045-37-0852) comprising 26.913 acres from the Planned Development - Industrial Park (PD-IP)…
-
VANTAGE DATA CENTER (VA16): Fast Track Application for a proposed Data Center building and the associated infrastructure.
-
VANTAGE DATA CENTER - BROAD RUN : A Zoning Conversion in the Route 28 Tax District to increase the development potential by allowing all permitted uses in the PD-IP District under the Revised 1993 Zoning Ordinance.
-
VANTAGE DATA CENTER - BROAD RUN - ZRTD-2023-0001: A Zoning Conversion in the Route 28 Tax District to increase the development potential by allowing all permitted uses in the PD-IP District under the Revised 1993 Zoning…
-
IAD03 Relocation Drive Phase II - Proposed Data Center building addition to add approximately 69k sf of GFA to the existing data center on the property.
-
RELOCATION DRIVE SITE PLAN : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED STMP-2022-0003, SPAM-2022-0072 (DATA CENTER, SWM/BMP VAULTS, AND ASSOCIATED INFRASTRUCTURE) TO ADD A STORMWATER…
-
RELOCATION DRIVE SITE PLAN : REQUEST APPROVAL OF A (SPAM) FOR SITE PLAN REVISION to STMP-2022-0003 (Data Center) INCREASE BUILDING GROSS FLOOR AREA, LIGHTING REVISION,STORMWATER MANAGEMENT VAULT REVISION, REVISE…
-
ALIGNED ENERGY DATA CENTER - SPEX-2022-0024: A Special Exception for an increase in FAR above the .60 limit pursuant to Section 4-306(C) of the Zoning Ordinance, which allows fora maximum of 2.0 FAR by special…
-
RELOCATION DRIVE : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR (1) ONE DATA CENTER AND ASSOCIATED INFRASTRUCTURE INCLUDING SWM AND BMP TOTALING THREE HUNDRED FOUR THOUSAND ONE HUNDRED SIXTY-SIX SQUARE…
-
ALIGNED ENERGY DATA CENTER : A Minor Special Exception to Section 5-1403(B). 1. To reduce the building setback from 75 feet to 58 feet along the South Sterling Boulevard right of way. 2. To reduce the parking setback…
-
ALIGNED ENERGY DATA CENTER : A Zoning Map Amendment to rezoning the Property from R-1 to PD-OP, which allows data center uses by-right
-
ALIGNED ENERGY DATA CENTER : A Special Exception for an increase in FAR above the .60 limit pursuant to Section 4-306(C) of the Zoning Ordinance, which allows fora maximum of 2.0 FAR by special exception. With this…
-
Relocation Drive Data Center: A Zoning Concept Plan Amendment and Special Exception to permit the redevelopment of existing Data Center uses at a 0.86 FAR.
-
SEE LEGI-2026-0020 FOR DOCUMENTS, TIMELINE AND WORKFLOW. Relocation Drive Data Center-A Special Exception to permit the redevelopment of existing Data Center uses at a 0.86 FAR.
-
GLOBAL PLAZA: A Special Exceptions to allow for a 1.0 floor area ratio (FAR) of data center uses. A Minor Special Exception to modify the building setback along the northern property boundary.
-
Bluebeam ID 305-463-286, PACIFIC CORPORATE PARK: Fast track site plan for construction of 3 data center buildings and a distribution substation. Includes new buildings, travelways, parking, stormwater facilities,…
-
PROJECT GOLD STERLING : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF PROPOSED 181,419 SF DATA CENTER BUILDING, 1,696 SF VISITORS CENTER BUILDING INCLUDING ALL RELATED INFRASTRUCTURE,…
-
STACK ASHBURN DATA CENTER (SPAM): This is a Site Plan Amendment to STPL-2020-0005 Stack Ashburn Data Center for the relocation of tree conservation landscaping necessitated by the proposed Loudoun Water Reclaim Water…
-
GLOBAL PLAZA SPEX-2024-0011: A Special Exception to permit up to 1.0 floor area ratio (FAR). SPEX-2025-0027: A Special Exception to permit a data center use in the Industrial Park (IP) Zoning District.
-
BUILDING VA15 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCITON OF DATA CENTER BUILDING WITH ASSOCIATED SURFACE PARKING, DRIVE AISLE, AND UTILITY INFRASTRUCTURE, IN THE (PDOP) PLANNED…
-
BUILDINGS VA 13 AND 14 : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) FOR THE CONSTRUCTION OF 735,714 SF OF DATA CENTER/OFFICE FLOOR AREA, IN THE PLANNED DEVELOPMENT OFFICE PARK (PDOP) ZONING DISTRICT.
-
BUILDINGS VA 13 & VA 14 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF +/- 729,298 SF OF DATA CENTER/OFFICE FLOOR AREA INCLUDING ALL RELATED INFRASTRUCTURE, UTILITIES, ETC. IN THE…
-
STERLING PREMIERE BUILDING : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF A DATA CENTER, AND ALL ASSOCIATED INFRASTRUCTRE INCLUDING BMP POND, IN THE( PDIP) PLANNED…
-
DARVISH DATA CENTER BUILDING B : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR A FAST TRACK SITE PLAN FOR CONSTRUCTION OF TWO DATA CENTER BUILDINGS, IN THE PLANNED DEVELOPMENT-INDUSTRIAL PARK (PDIP) ZONING…
-
DARVISH DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN )STMP) FOR A FAST TRACK SITE PLAN FOR CONSTRUCTION OF +/- 277,800 SF DATA CENTER BUILDING, IN THE (PDIP) PLANNED DEVELOPMENT-INDUSTRIAL PARK ZONING…
-
NORTHPOINTE : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED STPL-1990-0017 TO DEMOLISH A PORTION OF THE EXISTING BUILDINGAND CONSTRUCT A NEW DATA CENTER, IN THE PLANNED DEVELOPMENT- GENERAL…
-
VANTAGE DATA CENTER : A Zoning Map Amendment application to bring all seven parcels within the PD-IP district governed by the most updated version of the Revised1993 Loudoun County Zoning Ordinance.
-
VANTAGE DATA CENTER : A Special Exception application to increase the FAR on the Property from a .60 to a 1.0. in order to establish a data center on the property.
-
VANTAGE-VA22 : REQUEST APPROVAL OF A SITE PLAN (Fast Track) for the construction of Data Center, circulation drives, and associated infrastructure on landpreviously developed under. (PDIP) ZONING DISTRICT.…
-
VANTAGE VA21 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR A PROPOSEDDATA CENTER BUILDING AND ALL OF THE ASSOCIATED INFRASTRUCTURE INCLUDING SWM AND BMP VAULTS, IN THE PLANNED DEVELOPMENT- INDUSTRIAL…
-
(Conditional Approval) Sterling Technology Park - Proposed Construction of Data Center Building ,Mechanical Yards, Guard Booth, and related infrastructure
-
LOUDOUN BUSINESS PARK CMPT-2026-0010: A Commission Permit to permit a public utility. CMPT-2025-0008: A Commission Permit to permit a public utility. SPEX-2025-0061: A Special Exception to permit a data center in the…
-
LOUDOUN BUSINESS PARK CMPT-2026-0010: A Commission Permit to permit a public utility. CMPT-2025-0008: A Commission Permit to permit a public utility. SPEX-2025-0061: A Special Exception to permit a data center in the…
-
LOUDOUN BUSINESS PARK: A Special Exception for data center use, a Special Exception to increase the FAR up to 0.8, a Special Exception for each utility substation (3), and a Commission Permit to permit substation use.
-
LOUDOUN BUSINESS PARK: A Special Exception for data center use, a Special Exception to increase the FAR up to 0.8, a Special Exception for each utility substation (3), and a Commission Permit to permit substation use.
-
(Conditionally Approved) DULLES ELECTRIC DATA CENTERS: Construction of two 2-story data center buildings and associated infrastructure.
-
DULLES 28 TECHNOLOGY PARK : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE PROPOSED DEVELOPMENT OF TWO DATA CENTER BUILDINGS AND WHOLESALE/FLEX INDUSTRIAL BUILDINGS, IN THE PLANNED…
-
DULLES DISTRIBUTION CENTER PHASE 1 & 2 ZMAP-2024-0013: A Zoning Conversion in the Route 28 Tax District to convert approximately 32.48 acres from the Planned Development - Industrial Park (PD-IP) Zoning District under…
-
22990 INDIAN CREEK DR - The purpose of this site plan amendment is to change the use of the existing building from flex warehouse to data center.
-
EQUINIX ASHBURN EAST: SPEX-2024-0063: A Special Exception to allow data center development up to a 1.0 floor area ratio (FAR). SPEX-2025-0057: A Special Exception to permit a data center use in the Industrial Park (IP)…
-
SDC ASHBURN 1 SPEX-2025-0031: A Special Exception to permit the expansion of a data center building footprint from 14,386 square feet to 20,000 square feet.
-
DULLES BERRY LC8 DATA CENTER - This application is for the revision to approved EPLAN-2024-0093 Dulles Berry LC8 Data Center. Revisions include a proposed retaining wall, revisions to the limits of disturbance,…
-
Revisions to an approved Data Center Site plan to make minor site design adjustments to accommodate the updated security gate, gate equipment and security fence. This plan is associated with EPLAN-2023-0078
-
SPAM Application to revise the site layout, grading plan and utility plan to reflect design revisions.
-
21800 BEAUMEADE CIRCLE : A special exception to the maximum lot coverage from 45% to 55% for a data center.
-
LC9 & LC10 DATA CENTER - CONSTRUCTION OF A TWO (2) 2-STORY DATA CENTER BUILDINGS AND ASSOCIATED INFRASTRUCTURE
-
LC3 DATA CENTER: THIS APPLICATION IS AN AMENDMENT TO STPL-2020-0044, TO ADD A PERIMETER SECURITY FENCE AND GUARD SHACK TO THE PREVIOUSLY APPROVED SITE PLAN.
-
DIGITAL FILIGREE DATA CENTER: Modified Processing (Fast-Track) for proposed Data Center building, with improvements including but not limited to a proposed guard booth, proposed drives aisles, parking, utilities, SWM…
-
ZEBRA EAST ZCPA-2023-0005: A ZCPA application to amend a proffer statement associated with ZMAP-1998-0003 to permit additional FAR, and to develop data center uses. SPEX-2023-0019: A Special Exception per Section…
-
EQUINIX AT BEAUMEADE TECH CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO PROPOSE CONCRETE PADES ON NORTH SIDE OF EXCISTING BUILDING (DC-2) TO INSTALL GENERATORSAND AIR CONDENSING UNITS FOR THE EXISTING…
-
110 TERMINAL DRIVE DATA CENTER: Proposed Data Center and its associated infrastructure improvements.
-
QUANTUM PARK: ZCPA-2023-0008: A Zoning Concept Plan Amendment to expand the permitted building envelope for the development of office and data center uses consistent with the PD-OP zoning district, proffers approved…
-
GLENN DRIVE NORTH & SOUTH ZMAP-2024-0002: A Zoning Conversion in the Route 28 Tax District of 42.3 acres from the Planned Development–Industrial Park (PD-IP) Zoning District under the 1972 Zoning Ordinance to the…
-
GLENN DRIVE NORTH & SOUTH STATUS: 2nd Staff review complete. ZMAP-2024-0002: A Zoning Conversion in the Route 28 Tax District of 42.3 acres from the Planned Development–Industrial Park (PD-IP) Zoning District under the…
-
GLENN DRIVE NORTH & SOUTH ZMAP-2026-0001: A Zoning Map Amendment to rezone approximately 62.347 acres from the Industrial Park (IP) Zoning District to the IP Zoning District. ZMAP-2024-0002: A Zoning Conversion in the…
-
AREP BEAUMEADE DATA CENTER - Revision to previously approved STMP-2021-0006 and SPAM-2022-0033 to add 19 parking spaces
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO TEH PREVIOUSLY APPROVED STMP-2021-0006, IN THE (PDIP) PLANNED DEVELOPMENT- INDUSTRIALPARK ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES REVISION (CPAR) TOTHE PREVIOUSLY APPROVED CPAP-2021-0010 FOR CHANGES TO ASSOCIATED WITH SITE STORM SEWER INFRASTRUCTURE, IN THE PLANNED…
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR CONSTRUCTION ON A PROPOSED DATA CENTER AND UTILITIES, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES (CPAP) TO DEMOLISHAN EXISTING BUILDING, PARKING ISLES, SIDEWALKS, AS WELL AS ON-SITE UTILITIES TO BE REPLACED WITH PROPOSED UTLITIES AND…
-
MERCURE BUSINESS PARK LOT 22 - The purpose of this site plan amendment is to change the use of the existing building from flex warehouse to data center.
-
(Conditional Approval) Datacenter site revision updated building footprint for Building 2, revised storm sewer layout, revised parking, gate and fence location, access road and curb and gutter updated, water and…
-
LC 11 AND 12 DATA CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) TO CONSTRUCT TWO (2) DATA CENTERS AND ASSOCIATED INFRASTRUCTURE, IN THE PLANNED DEVELOPMENT - OFFICE PARK (PDOP) ZONING DISTRICT.
-
LC11 & LC12 DATA CENTER - REVISION TO APPROVED STPL-2023-0001. REVISIONS INCLUDEADDITION OF SECURITY FENCE AND GUARD SHACK, PAVEMENT/PARKING REVISIONS AND MINOR UTILITY REVISIONS.
-
WS-C2 : REQUEST APPROVAL OF A MODIFIED PROCESS PLAN PROCESS (STMP) FOR CONSTURCTION OF ONE 15,000 SF DATA CENTER AND ASSOCIATED GRADING AND UTILITY IMPROVEMENTS, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING…
-
WATERSIDE SITE PLAN LB B : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) FOR THE CONSTRUCTION OF TWO (2) TWO-STORY DATA CENTERS TOTALING 532,000 SF AND ASSOCIATED GRADING AND UTILITY IMPROVEMENTS, IN THE PLANNED…
-
MERCURE BUSINESS PARK LOTS 19 AND 20 - The purpose of this site plan amendment is to change the use of the existing building from flex warehouse to data center.
-
(Conditional Approval) Ashburn Shallow Bay - Proposed Construction of one Data Center building, Guard Booth, Circulation Drives, and associated infrastructure.
-
MERCURE BUSINESS PARK LOT 4A1B - The purpose of this site plan is to change the use of the existing building from flex warehouse to data center.
-
MERCURE BUSINESS PARK LOT 4A1A: The purpose of this site plan amendment is to change the use of the existing building from flex warehouse to data center.