25 filings (land-use applications and site plans) that mention a data center, from Loudoun County records; 11 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
Site Plan for development of 3 Data Center Buildings
-
EQUINIX ASHBURN NORTH: A Special Exception (SPEX) for Data Center Use and a Special Exception to exceed a 0.60 Floor Area Ratio on a 44-acre property in the Industrial Park (IP) Zoning District.
-
CORSCALE VA2 BLDG 1 (SPAM): Revision to STPL-2022-0012, a data center within the Kincora IP District.
-
CORSCALE VA2 BLDG 1 : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR THE CONSTRUCTION OF A DATACENTER BUILDING, IN THE PLANNED DEVELOPMENT- INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
(Conditional Approval) Ashburn Shallow Bay - Proposed Construction of one Data Center building, Guard Booth, Circulation Drives, and associated infrastructure.
-
AREP BEAUMEADE DATA CENTER - Revision to previously approved STMP-2021-0006 and SPAM-2022-0033 to add 19 parking spaces
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO TEH PREVIOUSLY APPROVED STMP-2021-0006, IN THE (PDIP) PLANNED DEVELOPMENT- INDUSTRIALPARK ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES REVISION (CPAR) TOTHE PREVIOUSLY APPROVED CPAP-2021-0010 FOR CHANGES TO ASSOCIATED WITH SITE STORM SEWER INFRASTRUCTURE, IN THE PLANNED…
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR CONSTRUCTION ON A PROPOSED DATA CENTER AND UTILITIES, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES (CPAP) TO DEMOLISHAN EXISTING BUILDING, PARKING ISLES, SIDEWALKS, AS WELL AS ON-SITE UTILITIES TO BE REPLACED WITH PROPOSED UTLITIES AND…
-
(Conditional Approval) Datacenter site revision updated building footprint for Building 2, revised storm sewer layout, revised parking, gate and fence location, access road and curb and gutter updated, water and…
-
45360 SEVERN WAY DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED SPAM-2017-0038 FOR A WATER TANK EXPANSION AND PARKING RECONFIGURATION, IN THE PLANNED DEVELOPMENT - INDUSTRIAL…
-
EQUINIX AT BEAUMEADE TECH CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO PROPOSE CONCRETE PADES ON NORTH SIDE OF EXCISTING BUILDING (DC-2) TO INSTALL GENERATORSAND AIR CONDENSING UNITS FOR THE EXISTING…
-
THAYER RD DATA CENTER SPAM: THIS SPAM IS TO ADJUST THE BUILDING HEIGHT OF THE PROPOSED BUILDING FROM 45' TO 65'. NOTE THAT THE SIGNING ENGINEER FOR GORDON IS ONLY VALIDATING THE CHANGE IN BUILDING HEIGHT ON THE CLOUDED…
-
(Conditional Approval) Thayer Road - This project consists of a proposed 2-story data center with a road around it, utilities, and other associated infrastructure.
-
21800 BEAUMEADE CIRCLE : A special exception to the maximum lot coverage from 45% to 55% for a data center.
-
Revisions to an approved Data Center Site plan to make minor site design adjustments to accommodate the updated security gate, gate equipment and security fence. This plan is associated with EPLAN-2023-0078
-
SPAM Application to revise the site layout, grading plan and utility plan to reflect design revisions.
-
DIGITAL FILIGREE DATA CENTER: Modified Processing (Fast-Track) for proposed Data Center building, with improvements including but not limited to a proposed guard booth, proposed drives aisles, parking, utilities, SWM…
-
(Conditional Approval) DULLES DESIGN DATA CENTER: Proposed 2-Story Data Center (STPL)
-
EQUINIX ASHBURN EAST: SPEX-2024-0063: A Special Exception to allow data center development up to a 1.0 floor area ratio (FAR). SPEX-2025-0057: A Special Exception to permit a data center use in the Industrial Park (IP)…
-
LC3 DATA CENTER: THIS APPLICATION IS AN AMENDMENT TO STPL-2020-0044, TO ADD A PERIMETER SECURITY FENCE AND GUARD SHACK TO THE PREVIOUSLY APPROVED SITE PLAN.
-
Revision associated with this site plan revision include additional floor area for the guard shack booth at the secure entrance to the subject site per approved site plan STMP-2022-0004
-
DULLES 28 TECHNOLOGY PARK : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE PROPOSED DEVELOPMENT OF TWO DATA CENTER BUILDINGS AND WHOLESALE/FLEX INDUSTRIAL BUILDINGS, IN THE PLANNED…
-
BRIDGEFIELD TECH CENTER: Site plan application for the development of data center buildings.