Browse › Loudoun County › Data center
Amazon Data Services, Inc. IAD-140/141/143
Operating on Virginia DEQ's records ·
22890 Platform Plaza, Sterling 20166 · Loudoun County · ZIP 20166
See it on the map
Air permits
- 74184-4, issued Aug 1, 2022 (Article 6 - mNSR)
Timeline
What the official records show for this site, oldest first: county filings, DEQ air permits, and changes the
daily check has seen on DEQ's records since Sep 28, 2026. County filings within 0.25 miles are placed here by this site, by location only: they may be a different project, so check the county record.
- Dec 10, 2021 County Site plan STMP-2021-0018 filed with Loudoun County: WS-C2. Status now: Site plan approved. Matched by location (0.10 mi away)
- Dec 10, 2021 County Site plan SPAM-2021-0072 filed with Loudoun County: WATERSIDE SITE PLAN LB B. Status now: Site plan approved. Matched by location (0.10 mi away)
- Aug 1, 2022 DEQ Air permit 74184-4 issued: minor new source review (Article 6).
- Aug 1, 2024 County Site plan EPLAN-2024-0105 filed with Loudoun County: 110 Terminal Drive Data Center. Status now: Site plan in review. Matched by location (0.23 mi away)
Its permits on DEQ's list are minor new source review (Article 6) permits. DEQ requires a public comment period for permits for major sources (Title V, PSD, nonattainment new source review and Acid Rain); these permit types aren't on that list.
Any open comment period on an air permit is listed on DEQ's Air Public Notices page, and DEQ's email alerts ("Public Notice-Air") announce them; this site doesn't track them. Whether a data center needs a local vote depends on the site's zoning: where it needs a rezoning or special exception, the county or city board decides, usually after a public hearing: see how to take part in Loudoun County. (DEQ's rules as its notices page describes them, checked Oct 12, 2026.)
Schools within 2 miles
Other data centers within 1 mile
-
Operating 45900 Pathfinder Way, Sterling · Loudoun County · air permit Nov 6, 2024
-
Operating 22811 International Drive, Sterling · Loudoun County · air permit Oct 13, 2016
-
Operating 22810 International Drive, Sterling · Loudoun County · air permit Sep 16, 2003
-
Operating 22945 International Drive, Sterling · Loudoun County · air permit Jun 21, 2024
County filings within 2 miles
46 filings (land-use applications and site plans) that mention a data center, from Chesterfield County, Loudoun County, Prince William County, Spotsylvania County and Stafford County records; 18 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
WS-C2 : REQUEST APPROVAL OF A MODIFIED PROCESS PLAN PROCESS (STMP) FOR CONSTURCTION OF ONE 15,000 SF DATA CENTER AND ASSOCIATED GRADING AND UTILITY IMPROVEMENTS, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING…
-
WATERSIDE SITE PLAN LB B : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) FOR THE CONSTRUCTION OF TWO (2) TWO-STORY DATA CENTERS TOTALING 532,000 SF AND ASSOCIATED GRADING AND UTILITY IMPROVEMENTS, IN THE PLANNED…
-
110 TERMINAL DRIVE DATA CENTER: Proposed Data Center and its associated infrastructure improvements.
-
GLENN DRIVE NORTH & SOUTH ZMAP-2024-0002: A Zoning Conversion in the Route 28 Tax District of 42.3 acres from the Planned Development–Industrial Park (PD-IP) Zoning District under the 1972 Zoning Ordinance to the…
-
GLENN DRIVE NORTH & SOUTH STATUS: 2nd Staff review complete. ZMAP-2024-0002: A Zoning Conversion in the Route 28 Tax District of 42.3 acres from the Planned Development–Industrial Park (PD-IP) Zoning District under the…
-
GLENN DRIVE NORTH & SOUTH ZMAP-2026-0001: A Zoning Map Amendment to rezone approximately 62.347 acres from the Industrial Park (IP) Zoning District to the IP Zoning District. ZMAP-2024-0002: A Zoning Conversion in the…
-
22990 INDIAN CREEK DR - The purpose of this site plan amendment is to change the use of the existing building from flex warehouse to data center.
-
(Conditionally Approved) DULLES ELECTRIC DATA CENTERS: Construction of two 2-story data center buildings and associated infrastructure.
-
DARVISH DATA CENTER BUILDING B : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR A FAST TRACK SITE PLAN FOR CONSTRUCTION OF TWO DATA CENTER BUILDINGS, IN THE PLANNED DEVELOPMENT-INDUSTRIAL PARK (PDIP) ZONING…
-
DARVISH DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN )STMP) FOR A FAST TRACK SITE PLAN FOR CONSTRUCTION OF +/- 277,800 SF DATA CENTER BUILDING, IN THE (PDIP) PLANNED DEVELOPMENT-INDUSTRIAL PARK ZONING…
-
STERLING PREMIERE BUILDING : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF A DATA CENTER, AND ALL ASSOCIATED INFRASTRUCTRE INCLUDING BMP POND, IN THE( PDIP) PLANNED…
-
LOUDOUN BUSINESS PARK CMPT-2026-0010: A Commission Permit to permit a public utility. CMPT-2025-0008: A Commission Permit to permit a public utility. SPEX-2025-0061: A Special Exception to permit a data center in the…
-
LOUDOUN BUSINESS PARK CMPT-2026-0010: A Commission Permit to permit a public utility. CMPT-2025-0008: A Commission Permit to permit a public utility. SPEX-2025-0061: A Special Exception to permit a data center in the…
-
LOUDOUN BUSINESS PARK: A Special Exception for data center use, a Special Exception to increase the FAR up to 0.8, a Special Exception for each utility substation (3), and a Commission Permit to permit substation use.
-
LOUDOUN BUSINESS PARK: A Special Exception for data center use, a Special Exception to increase the FAR up to 0.8, a Special Exception for each utility substation (3), and a Commission Permit to permit substation use.
-
(Conditional Approval) Sterling Technology Park - Proposed Construction of Data Center Building ,Mechanical Yards, Guard Booth, and related infrastructure
-
PROJECT GOLD STERLING : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF PROPOSED 181,419 SF DATA CENTER BUILDING, 1,696 SF VISITORS CENTER BUILDING INCLUDING ALL RELATED INFRASTRUCTURE,…
-
GLOBAL PLAZA SPEX-2024-0011: A Special Exception to permit up to 1.0 floor area ratio (FAR). SPEX-2025-0027: A Special Exception to permit a data center use in the Industrial Park (IP) Zoning District.
-
GLOBAL PLAZA: A Special Exceptions to allow for a 1.0 floor area ratio (FAR) of data center uses. A Minor Special Exception to modify the building setback along the northern property boundary.
-
VANTAGE-VA22 : REQUEST APPROVAL OF A SITE PLAN (Fast Track) for the construction of Data Center, circulation drives, and associated infrastructure on landpreviously developed under. (PDIP) ZONING DISTRICT.…
-
VANTAGE VA21 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR A PROPOSEDDATA CENTER BUILDING AND ALL OF THE ASSOCIATED INFRASTRUCTURE INCLUDING SWM AND BMP VAULTS, IN THE PLANNED DEVELOPMENT- INDUSTRIAL…
-
VANTAGE DATA CENTER : A Zoning Map Amendment application to bring all seven parcels within the PD-IP district governed by the most updated version of the Revised1993 Loudoun County Zoning Ordinance.
-
VANTAGE DATA CENTER : A Special Exception application to increase the FAR on the Property from a .60 to a 1.0. in order to establish a data center on the property.
-
ALIGNED ENERGY DATA CENTER : A Minor Special Exception to Section 5-1403(B). 1. To reduce the building setback from 75 feet to 58 feet along the South Sterling Boulevard right of way. 2. To reduce the parking setback…
-
ALIGNED ENERGY DATA CENTER : A Zoning Map Amendment to rezoning the Property from R-1 to PD-OP, which allows data center uses by-right
-
ALIGNED ENERGY DATA CENTER : A Special Exception for an increase in FAR above the .60 limit pursuant to Section 4-306(C) of the Zoning Ordinance, which allows fora maximum of 2.0 FAR by special exception. With this…
-
IAD03 Relocation Drive Phase II - Proposed Data Center building addition to add approximately 69k sf of GFA to the existing data center on the property.
-
RELOCATION DRIVE SITE PLAN : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED STMP-2022-0003, SPAM-2022-0072 (DATA CENTER, SWM/BMP VAULTS, AND ASSOCIATED INFRASTRUCTURE) TO ADD A STORMWATER…
-
RELOCATION DRIVE SITE PLAN : REQUEST APPROVAL OF A (SPAM) FOR SITE PLAN REVISION to STMP-2022-0003 (Data Center) INCREASE BUILDING GROSS FLOOR AREA, LIGHTING REVISION,STORMWATER MANAGEMENT VAULT REVISION, REVISE…
-
ALIGNED ENERGY DATA CENTER - SPEX-2022-0024: A Special Exception for an increase in FAR above the .60 limit pursuant to Section 4-306(C) of the Zoning Ordinance, which allows fora maximum of 2.0 FAR by special…
-
RELOCATION DRIVE : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR (1) ONE DATA CENTER AND ASSOCIATED INFRASTRUCTURE INCLUDING SWM AND BMP TOTALING THREE HUNDRED FOUR THOUSAND ONE HUNDRED SIXTY-SIX SQUARE…
-
Relocation Drive Data Center: A Zoning Concept Plan Amendment and Special Exception to permit the redevelopment of existing Data Center uses at a 0.86 FAR.
-
SEE LEGI-2026-0020 FOR DOCUMENTS, TIMELINE AND WORKFLOW. Relocation Drive Data Center-A Special Exception to permit the redevelopment of existing Data Center uses at a 0.86 FAR.
-
DULLES DISTRIBUTION CENTER PHASE 1 & 2 ZMAP-2024-0013: A Zoning Conversion in the Route 28 Tax District to convert approximately 32.48 acres from the Planned Development - Industrial Park (PD-IP) Zoning District under…
-
DULLES DOWNS ZMAP-2024-0014: A Zoning Conversion in the Route 28 Tax District to convert two parcels (PINs 045-28-2657 and 045-37-0852) comprising 26.913 acres from the Planned Development - Industrial Park (PD-IP)…
-
NORTHPOINTE : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED STPL-1990-0017 TO DEMOLISH A PORTION OF THE EXISTING BUILDINGAND CONSTRUCT A NEW DATA CENTER, IN THE PLANNED DEVELOPMENT- GENERAL…
-
BUILDING VA15 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCITON OF DATA CENTER BUILDING WITH ASSOCIATED SURFACE PARKING, DRIVE AISLE, AND UTILITY INFRASTRUCTURE, IN THE (PDOP) PLANNED…
-
BUILDINGS VA 13 AND 14 : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) FOR THE CONSTRUCTION OF 735,714 SF OF DATA CENTER/OFFICE FLOOR AREA, IN THE PLANNED DEVELOPMENT OFFICE PARK (PDOP) ZONING DISTRICT.
-
BUILDINGS VA 13 & VA 14 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF +/- 729,298 SF OF DATA CENTER/OFFICE FLOOR AREA INCLUDING ALL RELATED INFRASTRUCTURE, UTILITIES, ETC. IN THE…
-
VANTAGE DATA CENTER (VA16): Fast Track Application for a proposed Data Center building and the associated infrastructure.
-
VANTAGE DATA CENTER - BROAD RUN : A Zoning Conversion in the Route 28 Tax District to increase the development potential by allowing all permitted uses in the PD-IP District under the Revised 1993 Zoning Ordinance.
-
VANTAGE DATA CENTER - BROAD RUN - ZRTD-2023-0001: A Zoning Conversion in the Route 28 Tax District to increase the development potential by allowing all permitted uses in the PD-IP District under the Revised 1993 Zoning…
-
Site Plan Amendment to previously approved EPLAN-2023-0087 which is a 42 megawatt data center with the associated infrastructure, roads, parking, & utilities.
-
1501 MORAN ROAD - AS02: This plan proposes a data center with the associated utilities, roads, and parking. STPL
-
1501 MORAN ROAD : A Zoning Conversion to convert the property to PD-IP district pursuantto the Revised 1993 Zoning Ordinance and a Special Exception to increase density to1.0 FAR considering developing with data center…
-
1501 MORAN ROAD : A Special Exception to increase density to 1.0 FAR considering developing with data center use.
Who represents this area
This data center is in Loudoun County's Sterling Election District, on the county's official district map. That district elects a member of the Loudoun County Board of Supervisors, which decides rezonings and special exceptions for data centers.
Your own home may be in a different district: check Loudoun's election district maps. How to take part in Loudoun County: meetings, speaking and written comments.
State legislators: Who's My Legislator (Virginia General Assembly) shows your Virginia House of Delegates and Senate districts, for any address.
Electric utility
The federal map's approximate service areas of 2 utilities overlap here, so this data center is served by one of them:
From the federal electric retail service territories layer
(U.S. Department of Energy), which is approximate near boundaries: your bill names your utility. Averages are this
site's calculation from EIA Form 861 (2025), across all of the utility's customers, not anyone's bill. Rates are
set for the utility as a whole, not by what's built nearby.
Source
DEQ Air Sites record 74184 (permit class: 80% Synthetic Minor).
The stage is DEQ's own. This page is rebuilt every morning from DEQ's records.
Follow changes here
New data centers, stage changes and air permits on DEQ's records, and county filings, at this site (county filings within 0.25 miles), as the
daily check finds them: RSS feed for this page. Paste that link into any feed reader
(many can also send updates by email). There's nothing to sign up for, so this site never knows who follows.
No changes at this site (county filings within 0.25 miles) since the daily check began on Sep 28, 2026.