Operating 21741 Red Rum Dr, Ashburn · Loudoun County · air permit Dec 3, 2024
-
Operating 44245 Gigabit Plaza, Ashburn · Loudoun County · air permit Jul 11, 2025
-
Operating 21635 Red Rum Dr, Ashburn · Loudoun County · air permit Aug 4, 2025
-
Operating 21890 Uunet Drive, Ashburn · Loudoun County · air permit Jul 18, 2022
-
Operating 22001 Loudoun County Pkwy, Ashburn · Loudoun County · air permit Feb 26, 2020
-
Operating 22001 Loudoun County Parkway, Ashburn · Loudoun County · air permit Feb 26, 2020
-
Operating 44480 44520 44521 Hastings Dr and 44490 Chilum Pl, Ashburn · Loudoun County · air permit Aug 23, 2017
-
Operating 44470 Chilum Pl, Ashburn · Loudoun County · air permit Apr 28, 2009
-
Operating 45005 Russel Branch Pkwy, Ashburn · Loudoun County · air permit Oct 13, 2011
-
Operating 21271 Smith Switch Rd, Ashburn · Loudoun County · air permit May 8, 2024
-
Operating 21955 Loudoun County Parkway, Ashburn · Loudoun County · air permit Feb 12, 2025
-
Operating 44274 Roundtable Plaza, Ashburn · Loudoun County · air permit Oct 12, 2022
-
Operating 21745 Beaumeade Circle, Ashburn · Loudoun County · air permit Jul 23, 2025
28 filings (land-use applications and site plans) that mention a data center, from Loudoun County records; 11 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
Revision associated with this site plan revision include additional floor area for the guard shack booth at the secure entrance to the subject site per approved site plan STMP-2022-0004
-
ASHBURN CENTER NORTH : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR A PROPOSED DATA CENTER, IN THE PLANNED DEVELOPMENT-INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
Gen yard design for a data center
-
QUANTUM PARK: ZCPA-2023-0008: A Zoning Concept Plan Amendment to expand the permitted building envelope for the development of office and data center uses consistent with the PD-OP zoning district, proffers approved…
-
LC11 & LC12 DATA CENTER - REVISION TO APPROVED STPL-2023-0001. REVISIONS INCLUDEADDITION OF SECURITY FENCE AND GUARD SHACK, PAVEMENT/PARKING REVISIONS AND MINOR UTILITY REVISIONS.
-
LC 11 AND 12 DATA CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) TO CONSTRUCT TWO (2) DATA CENTERS AND ASSOCIATED INFRASTRUCTURE, IN THE PLANNED DEVELOPMENT - OFFICE PARK (PDOP) ZONING DISTRICT.
-
EQUINIX AT BEAUMEADE TECH CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO PROPOSE CONCRETE PADES ON NORTH SIDE OF EXCISTING BUILDING (DC-2) TO INSTALL GENERATORSAND AIR CONDENSING UNITS FOR THE EXISTING…
-
(Conditional Approval) Datacenter site revision updated building footprint for Building 2, revised storm sewer layout, revised parking, gate and fence location, access road and curb and gutter updated, water and…
-
LC3 DATA CENTER: THIS APPLICATION IS AN AMENDMENT TO STPL-2020-0044, TO ADD A PERIMETER SECURITY FENCE AND GUARD SHACK TO THE PREVIOUSLY APPROVED SITE PLAN.
-
ZEBRA EAST ZCPA-2023-0005: A ZCPA application to amend a proffer statement associated with ZMAP-1998-0003 to permit additional FAR, and to develop data center uses. SPEX-2023-0019: A Special Exception per Section…
-
(Conditional Approval) Ashburn Shallow Bay - Proposed Construction of one Data Center building, Guard Booth, Circulation Drives, and associated infrastructure.
-
DIGITAL FILIGREE DATA CENTER: Modified Processing (Fast-Track) for proposed Data Center building, with improvements including but not limited to a proposed guard booth, proposed drives aisles, parking, utilities, SWM…
-
LC9 & LC10 DATA CENTER - CONSTRUCTION OF A TWO (2) 2-STORY DATA CENTER BUILDINGS AND ASSOCIATED INFRASTRUCTURE
-
DULLES BERRY LC8 DATA CENTER - This application is for the revision to approved EPLAN-2024-0093 Dulles Berry LC8 Data Center. Revisions include a proposed retaining wall, revisions to the limits of disturbance,…
-
EQUINIX ASHBURN EAST: SPEX-2024-0063: A Special Exception to allow data center development up to a 1.0 floor area ratio (FAR). SPEX-2025-0057: A Special Exception to permit a data center use in the Industrial Park (IP)…
-
21800 BEAUMEADE CIRCLE : A special exception to the maximum lot coverage from 45% to 55% for a data center.
-
Revisions to an approved Data Center Site plan to make minor site design adjustments to accommodate the updated security gate, gate equipment and security fence. This plan is associated with EPLAN-2023-0078
-
SPAM Application to revise the site layout, grading plan and utility plan to reflect design revisions.
-
EQUINIX ASHBURN NORTH: A Special Exception (SPEX) for Data Center Use and a Special Exception to exceed a 0.60 Floor Area Ratio on a 44-acre property in the Industrial Park (IP) Zoning District.
-
AREP BEAUMEADE DATA CENTER - Revision to previously approved STMP-2021-0006 and SPAM-2022-0033 to add 19 parking spaces
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO TEH PREVIOUSLY APPROVED STMP-2021-0006, IN THE (PDIP) PLANNED DEVELOPMENT- INDUSTRIALPARK ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES REVISION (CPAR) TOTHE PREVIOUSLY APPROVED CPAP-2021-0010 FOR CHANGES TO ASSOCIATED WITH SITE STORM SEWER INFRASTRUCTURE, IN THE PLANNED…
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR CONSTRUCTION ON A PROPOSED DATA CENTER AND UTILITIES, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
AREP BEAUMEADE DATA CENTER : REQUEST APPROVAL OF CONSTRUCTION PLANS AND PROFILES (CPAP) TO DEMOLISHAN EXISTING BUILDING, PARKING ISLES, SIDEWALKS, AS WELL AS ON-SITE UTILITIES TO BE REPLACED WITH PROPOSED UTLITIES AND…
-
SDC ASHBURN 1 SPEX-2025-0031: A Special Exception to permit the expansion of a data center building footprint from 14,386 square feet to 20,000 square feet.
-
Site Plan for development of 3 Data Center Buildings
-
Bluebeam ID 305-463-286, PACIFIC CORPORATE PARK: Fast track site plan for construction of 3 data center buildings and a distribution substation. Includes new buildings, travelways, parking, stormwater facilities,…
-
DULLES 28 TECHNOLOGY PARK : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE PROPOSED DEVELOPMENT OF TWO DATA CENTER BUILDINGS AND WHOLESALE/FLEX INDUSTRIAL BUILDINGS, IN THE PLANNED…