Data centers near Elaine E. Thompson Elementary
Elaine E. Thompson Elementary, 24200 Pissaro Drive, Sterling. Virginia DEQ's records show 8 data centers within 2 miles: 2 planned, 6 operating. 2 within 1 mile.
Open on the map
-
Operating 42575 Arcola Blvd, Sterling · Loudoun County · air permit Jan 30, 2024
-
Operating 42949 42948 42800 42948 Fadeley Lane, Sterling · Loudoun County · air permit Nov 21, 2022
-
Operating 24171 Youngwood Lane, Aldie · Loudoun County · air permit Aug 13, 2026
-
Planned 42090 Reeds Farm Lane, Stone Ridge · Loudoun County · air permit Mar 20, 2026
-
Operating 43290 Old Ox Road, Sterling · Loudoun County · air permit Nov 6, 2025
-
Operating 24282 Quail Ridge Lane, Aldie · Loudoun County · air permit Jul 21, 2025
-
Planned 24214 Quail Ridge Lane, Aldie · Loudoun County · air permit Dec 27, 2023
-
Operating 23825 Erins Run Drive, Sterling · Loudoun County · air permit Jun 16, 2026
County filings within 2 miles
27 filings (land-use applications and site plans) that mention a data center, from Chesterfield County, Loudoun County, Prince William County, Spotsylvania County and Stafford County records; 17 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
(Conditional Approval) DULLES TRADE CENTER LOTS 10 & 11 : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) FOR THE CONVERTING OFBUILDING USE FROM WAREHOUSE TO DATA CENTER, IN THE (PDGI) PLANNED DEVELOPMENT GENERAL…
-
The applicant requests approval for a minor addition to a principal building on an approved Special Exception pursuant to Section 10.11.01.H.2. for a 14,177-square-foot footprint addition to the existing data center…
-
The county record's description names individuals; see the county record.
-
(Conditional Approval) PROJECT MOTION - PH 4: Site Plan for Data Center and support facilities.
-
PROJECT MOTION PH 3: Site Plan (STMP) for Data Center and support facilities.
-
CLINTMAR DATA CENTERS: The development of vacant parcels to provide a 2-story Data Center with associated infrastructure and improvements.
-
Site Plan for 2 proposed Data Center buildings, guard booth and all associated infrastructure.
-
(Conditional Approval) JK TECHNOLOGY PARK #3: Proposed Data Center and associated infrastructure (STPL)
-
BRAMBLETON BUSINESS CAMPUS DATA CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR THE CONSTRUCTION OF A TWO (2) DATA CENTERS AND SUPPORTING UTILITIES, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) AND THE PLANNED…
-
(Conditional Approval) BRAMBLETON SHREVEPORT SOUTH DATA CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR THE CONSTRUCTION OF A TWO (2) DATA CENTERS AND SUPPORTING UTILITIES, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK…
-
JK Technology Park #2 - STPL for construction of two (2) data center buildings with associated infrastructure and relocation of pond proposed with future Dulles West Boulevard (designed with CRCP-2020-0012)
-
YONDR-TARRING SPEX-2025-0128: A Special Exception to permit a data center use in the General Industry (GI) Zoning District SPEX-2025-0144: A Minor Special Exception to eliminate the berm and fencing requirements along a…
-
ALLEGRO NORTH CAMPUS - BLDG 2B-2E: The Site Plan is for Buildings 2B-2E of the North Campus of a data center complex with associated support facilities.
-
(Conditional Approval) ARCOLA (name withheld) PROPERTY : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR TWO DATA CENTER BUILDINGS WITH ASSOCIATED INFRASTRUCTURE, IN THE PLANNED DEVELOPMENT- GENERAL INDUSTRIAL (PDGI) ZONING…
-
This project proposes construction of an approximately 100,000 SF data center, parking lot and associated utilities to serve the building. The total disturbed area is 10.58 AC.
-
(Conditional Approval) (STPL) ALLEGRO NORTH CAMPUS - BLDG 2A: Data Center and support facilities.
-
See LEGI-2023-0090 for all documents, timelines and workflow - RACEFIELD SUBSTATION : A Commission Permit for a Utility Substation to serve planned data center and an existing data center on property.
-
IAD12 & IAD13 DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR CONSTRUCTION OF TWO (2) DATA CENTER BUILDINGS AND ASSOCIATED ROADS, UTILITIES, AND AN OFFSITE STEP POOL CONVEYANCE SYSTEM, IN THE…
-
IAD11 DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) FOR THE CONSTRUCTION OF THE ELECTRICAL SUBSTATION WITH ACCESS ROAD TO CONNECT TO AN EXISTING ACCESS ROAD, IN THE PLANNED DEVELOPMENT- INDUSTRIAL PARK…
-
IAD11 DATA CENTER : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF 1 DATA CENTER BUILDING, IN THE PLANNED DEVELOPMENT-INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
CYRUSONE STERLING 11 DATA CENTER - PHASE 2: Revision to the approved plan (STMP-2022-0017) showing electrical & telecom duct banks as well as an updated loading dock footprint.
-
CYRUSONE STERLING 11 DATA CENTER PH 2 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF A DATA CENTER FACILITY WHICH WILL INCLUDE DATA HALLS, OFFICE SPACE, AND ASSOCIATED ROADWAY, PARKING…
-
CYRUSONE STERLING 9 DATA CENTER PH 1B : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED STMP-2019-0012 TO MAKE MODIFICATIONS TO THE BUILDING AND INFRASTRUCTURE IN THE PREVIOUSLY APPROVED PH…
-
Site plan for the construction of 3 Data Center buildings, a warehouse building, and associated infrastructure
-
THE SUBJECT OF THIS APPLICATION CONSISTS OF THE DESIGN OF A 1-STORY DATA CENTER BUILDING AND ASSOCIATED UTILITIES AND INFRASTRUCTURE.
-
WEST DULLES AND DULLES COMMERCE CENTER ZMAP-2024-0015: A Zoning Map Amendment of 94.35 acres from the General Industry (GI) Zoning District to the Industrial Park (IP) Zoning District. SPEX-2024-0058: A Special…
-
STPL- Proposed redevelopment of existing parking lot into 4 data center buildings with associated improvements
Who represents this area
Elaine E. Thompson Elementary is in Loudoun County's Dulles Election District, on the county's official district map. That district elects a member of the Loudoun County Board of Supervisors, which decides rezonings and special exceptions for data centers.
Your own home may be in a different district: check Loudoun's election district maps. How to take part in Loudoun County: meetings, speaking and written comments.
State legislators: Who's My Legislator (Virginia General Assembly) shows your Virginia House of Delegates and Senate districts, for any address.
Electric utility
Elaine E. Thompson Elementary is inside the approximate service area of:
From the federal electric retail service territories layer
(U.S. Department of Energy), which is approximate near boundaries: your bill names your utility. Averages are this
site's calculation from EIA Form 861 (2025), across all of the utility's customers, not anyone's bill. Rates are
set for the utility as a whole, not by what's built nearby.
Straight-line distance from the school's location (National Center for Education Statistics).
Virginia's 2026 siting law requires a sound study covering schools within 500 feet of a new high-energy
facility before a county can approve it.
Follow changes here
New data centers, stage changes and air permits on DEQ's records, and county filings, within 2 miles, as the
daily check finds them: RSS feed for this page. Paste that link into any feed reader
(many can also send updates by email). There's nothing to sign up for, so this site never knows who follows.
- Project Motion - Phase 4: County filing changed from “Site plan in review” to “Site plan approved” Oct 26, 2026