Browse › Schools › Park View High
Data centers near Park View High
Park View High, 400 W Laurel Ave, Sterling. Virginia DEQ's records show 11 data centers within 2 miles: 1 planned, 10 operating. 3 within 1 mile.
Open on the map
-
Operating 45905 Maries Road, Sterling · Loudoun County · air permit Oct 3, 2022
-
Operating 45901 Nokes Blvd, Sterling · Loudoun County · air permit Oct 30, 2019
-
Planned 45831 Maries Road, Sterling · Loudoun County · air permit Sep 18, 2025
-
Operating 45781 Maries Road, Sterling · Loudoun County · air permit Aug 8, 2025
-
Operating 21111 Ridgetop Circle, Sterling · Loudoun County · air permit Nov 1, 2016
-
Operating 45745 Nokes Blvd, Dulles · Loudoun County · air permit Jul 16, 2014
-
Operating 45630 Severn Way, Sterling · Loudoun County · air permit Aug 27, 2024
-
Operating 21099 Atlantic Boulevard, Sterling · Loudoun County · air permit Jun 21, 2024
-
Operating 21350 Pacific Boulevard, Sterling · Loudoun County · air permit Sep 6, 2022
-
Operating 22435 Glenn Drive, Sterling · Loudoun County · air permit Sep 15, 2023
-
Operating 45900 Pathfinder Way, Sterling · Loudoun County · air permit Nov 6, 2024
County filings within 2 miles
18 filings (land-use applications and site plans) that mention a data center, from Chesterfield County, Loudoun County, Prince William County, Spotsylvania County and Stafford County records; 10 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
(Conditional Approval) CLARKE HOOK CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) TO CONSTRUCT ONE DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
(Conditional Approval) MANEKIN PLAZA : REQUEST APPROVAL FOR A SITE PLAN (STPL) TO CONSTRUCT ONE DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
(Conditional Approval) RIDGETOP CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR THE CONSTRUCTION OF TWO DATA CENTER BUILDINGS, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
45865 MARIES ROAD : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR SITE IMPROVEMENTS FOR DATA CENTERS, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
45865 MARIES RD REZONING : A Zoning Map Amendment to rezone 10 acres from A-3 to PD-IP and a Special Exception to permit a maximum 1.0 FAR for data center use.
-
45865 MARIES RD REZONING : A Zoning Map Amendment to rezone 10 acres from A-3 to PD-IP and a Special Exception to permit a maximum 1.0 FAR for data center use.
-
HORSESHOE DRIVE: A Special Exception to allow for a 1.0 floor area ratio (FAR) of data center uses.
-
HORSESHOE DRIVE: A Special Exception to allow for a 1.0 floor area ratio (FAR) of data center uses.
-
(Conditional Approval) HORSESHOE DRIVE : REQUEST APPROVAL OF A SITE PLAN (STPL) TO BUILD A DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
(Maries Road) DULLES NORTH INDUSTRIAL PARK-LOT4 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR THE CONSTRUCTION OF ONE, TWO-STORY 212,960 SQUARE FOOT DATA CENTER AND ASSOCIATED SITE, GRADING, AND UTILITY…
-
THAYER RD DATA CENTER SPAM: THIS SPAM IS TO ADJUST THE BUILDING HEIGHT OF THE PROPOSED BUILDING FROM 45' TO 65'. NOTE THAT THE SIGNING ENGINEER FOR GORDON IS ONLY VALIDATING THE CHANGE IN BUILDING HEIGHT ON THE CLOUDED…
-
(Conditional Approval) Thayer Road - This project consists of a proposed 2-story data center with a road around it, utilities, and other associated infrastructure.
-
(Conditional Approval) DULLES DESIGN DATA CENTER: Proposed 2-Story Data Center (STPL)
-
45360 SEVERN WAY DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED SPAM-2017-0038 FOR A WATER TANK EXPANSION AND PARKING RECONFIGURATION, IN THE PLANNED DEVELOPMENT - INDUSTRIAL…
-
VANTAGE-VA22 : REQUEST APPROVAL OF A SITE PLAN (Fast Track) for the construction of Data Center, circulation drives, and associated infrastructure on landpreviously developed under. (PDIP) ZONING DISTRICT.…
-
VANTAGE VA21 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR A PROPOSEDDATA CENTER BUILDING AND ALL OF THE ASSOCIATED INFRASTRUCTURE INCLUDING SWM AND BMP VAULTS, IN THE PLANNED DEVELOPMENT- INDUSTRIAL…
-
VANTAGE DATA CENTER : A Zoning Map Amendment application to bring all seven parcels within the PD-IP district governed by the most updated version of the Revised1993 Loudoun County Zoning Ordinance.
-
VANTAGE DATA CENTER : A Special Exception application to increase the FAR on the Property from a .60 to a 1.0. in order to establish a data center on the property.
Who represents this area
Park View High is in Loudoun County's Sterling Election District, on the county's official district map. That district elects a member of the Loudoun County Board of Supervisors, which decides rezonings and special exceptions for data centers.
Your own home may be in a different district: check Loudoun's election district maps. How to take part in Loudoun County: meetings, speaking and written comments.
State legislators: Who's My Legislator (Virginia General Assembly) shows your Virginia House of Delegates and Senate districts, for any address.
Electric utility
Park View High is inside the approximate service area of:
From the federal electric retail service territories layer
(U.S. Department of Energy), which is approximate near boundaries: your bill names your utility. Averages are this
site's calculation from EIA Form 861 (2025), across all of the utility's customers, not anyone's bill. Rates are
set for the utility as a whole, not by what's built nearby.
Straight-line distance from the school's location (National Center for Education Statistics).
Virginia's 2026 siting law requires a sound study covering schools within 500 feet of a new high-energy
facility before a county can approve it.
Follow changes here
New data centers, stage changes and air permits on DEQ's records, and county filings, within 2 miles, as the
daily check finds them: RSS feed for this page. Paste that link into any feed reader
(many can also send updates by email). There's nothing to sign up for, so this site never knows who follows.
- DULLES NORTH INDUSTRIAL PARK-LOT4: New county filing: Site plan (Site plan in review) Oct 26, 2026