Park View High, 400 W Laurel Ave, Sterling. Virginia DEQ's records show 10 data centers within 2 miles: 1 planned, 9 operating. 4 within 1 mile.
-
Operating 45901 Nokes Blvd, Sterling · Loudoun County · air permit Oct 30, 2019
-
Operating 45905 Maries Road, Sterling · Loudoun County · air permit Oct 3, 2022
-
Planned 45831 Maries Road, Sterling · Loudoun County · air permit Sep 18, 2025
-
Operating 21111 Ridgetop Circle, Sterling · Loudoun County · air permit Nov 1, 2016
-
Operating 45745 Nokes Blvd, Dulles · Loudoun County · air permit Jul 16, 2014
-
Operating 45781 Maries Road, Sterling · Loudoun County · air permit Aug 8, 2025
-
Operating 45630 Severn Way, Sterling · Loudoun County · air permit Aug 27, 2024
-
Operating 21099 Atlantic Boulevard, Sterling · Loudoun County · air permit Jun 21, 2024
-
Operating 21350 Pacific Boulevard, Sterling · Loudoun County · air permit Sep 6, 2022
-
Operating 22435 Glenn Drive, Sterling · Loudoun County · air permit Sep 15, 2023
17 filings (land-use applications and site plans) that mention a data center, from Loudoun County records; 9 still in county review. Filings come before any DEQ air permit, so some of these may not be on DEQ's records yet.
-
(Conditional Approval) CLARKE HOOK CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) TO CONSTRUCT ONE DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
(Conditional Approval) MANEKIN PLAZA : REQUEST APPROVAL FOR A SITE PLAN (STPL) TO CONSTRUCT ONE DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
(Conditional Approval) RIDGETOP CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR THE CONSTRUCTION OF TWO DATA CENTER BUILDINGS, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
45865 MARIES ROAD : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR SITE IMPROVEMENTS FOR DATA CENTERS, IN THE PLANNED DEVELOPMENT INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
45865 MARIES RD REZONING : A Zoning Map Amendment to rezone 10 acres from A-3 to PD-IP and a Special Exception to permit a maximum 1.0 FAR for data center use.
-
45865 MARIES RD REZONING : A Zoning Map Amendment to rezone 10 acres from A-3 to PD-IP and a Special Exception to permit a maximum 1.0 FAR for data center use.
-
HORSESHOE DRIVE: A Special Exception to allow for a 1.0 floor area ratio (FAR) of data center uses.
-
HORSESHOE DRIVE: A Special Exception to allow for a 1.0 floor area ratio (FAR) of data center uses.
-
(Conditional Approval) HORSESHOE DRIVE : REQUEST APPROVAL OF A SITE PLAN (STPL) TO BUILD A DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT.
-
THAYER RD DATA CENTER SPAM: THIS SPAM IS TO ADJUST THE BUILDING HEIGHT OF THE PROPOSED BUILDING FROM 45' TO 65'. NOTE THAT THE SIGNING ENGINEER FOR GORDON IS ONLY VALIDATING THE CHANGE IN BUILDING HEIGHT ON THE CLOUDED…
-
(Conditional Approval) Thayer Road - This project consists of a proposed 2-story data center with a road around it, utilities, and other associated infrastructure.
-
(Conditional Approval) DULLES DESIGN DATA CENTER: Proposed 2-Story Data Center (STPL)
-
45360 SEVERN WAY DATA CENTER : REQUEST APPROVAL OF A SITE PLAN AMENDMENT (SPAM) TO THE PREVIOUSLY APPROVED SPAM-2017-0038 FOR A WATER TANK EXPANSION AND PARKING RECONFIGURATION, IN THE PLANNED DEVELOPMENT - INDUSTRIAL…
-
VANTAGE-VA22 : REQUEST APPROVAL OF A SITE PLAN (Fast Track) for the construction of Data Center, circulation drives, and associated infrastructure on landpreviously developed under. (PDIP) ZONING DISTRICT.…
-
VANTAGE VA21 : REQUEST APPROVAL OF A MODIFIED PROCESS SITE PLAN (STMP) FOR A PROPOSEDDATA CENTER BUILDING AND ALL OF THE ASSOCIATED INFRASTRUCTURE INCLUDING SWM AND BMP VAULTS, IN THE PLANNED DEVELOPMENT- INDUSTRIAL…
-
VANTAGE DATA CENTER : A Zoning Map Amendment application to bring all seven parcels within the PD-IP district governed by the most updated version of the Revised1993 Loudoun County Zoning Ordinance.
-
VANTAGE DATA CENTER : A Special Exception application to increase the FAR on the Property from a .60 to a 1.0. in order to establish a data center on the property.
Straight-line distance from the school's location (National Center for Education Statistics).
Virginia's 2026 siting law requires a sound study covering schools within 500 feet of a new high-energy
facility before a county can approve it.